British Pipelines Agency

CLIENT:

British Pipelines Agency

LOCATION:

Warwickshire

Austwel successfully delivered a complex civil engineering package at the Kingsbury Oil Terminal for British Pipelines Agency. The project focused on upgrading critical infrastructure to support new pump instrumentation and cable systems, all within a COMAH-regulated environment. Operating under stringent safety protocols, the Austwel team constructed reinforced concrete structures, carried out precision excavations, and reinstated existing access features to ensure the facility maintained full operational integrity throughout.

Take a look at the images below showcasing the site before, during and once the project was completed.

Scope of Work

Concrete Foundations

  • Constructed reinforced concrete slabs for new pump instrumentation and cable tray bases.
  • Installed smaller ancillary bases for supporting electrical ductwork and connection equipment.

Precision Excavation & Pipe Protection

  • Deployed vacuum excavation to safely remove large volumes of gravel and expose existing product drain pipework.
  • Protected pipework with expansion jointing material before concrete backfilling

Roadworks & Trough Installation

  • Used a floor saw to cut existing tarmac and excavated a trench for a precast concrete service trough installation.
  • Reinstated gravel batter and completed concrete margins to a high standard of finish.

Health & Safety Compliance

All plant and equipment fitted with Chalwyn valves and spark arrestors, meeting the high safety requirements of the COMAH site.

Other Case Studies

Drawpits & Path Complete

Ductworks & Chambers

CLIENT:

Ashdale Lifting on behalf of Welsh Water

LOCATION:

Wales, UK

Facilities at Murco Refinery, Milford Haven carried out by Austwel Engineeering. 16.04.10

COGENERATION PLANT PROJECT

CLIENT:

MURCO

LOCATION:

UK, Nationwide

Untitled design (38)

Solar Farm Consultancy

CLIENT:

Confidential

LOCATION:

UK, Nationwide

IMG-20240531-WA0197

MORFA SOLAR FARM

CLIENT:

Morfa Solar Farm

LOCATION:

Wales

east car park oct 12

VALERO CAR PARK

CLIENT:

Valero Refinery

LOCATION:

Valero, Pembrokeshire, Wales

IMG_4126

MILFORD HAVEN BANDSTAND REMOVAL

CLIENT:

Milford Haven Port Authority

LOCATION:

Pembrokeshire, Wales